Case Introduction
Dyeing, drying, pressing, sizing, printing and dyeing, shaping and other processes in textile industry are in great demand for steam, so 10tons coal-fired boiler is an important equipment to ensure the normal production process of textiles. Soorty is one of the largest denim manufacturers in Pakistan, with its capacity to produce 5.5m metres of fabric and 2.8m garments per month increasingly demanding coal-fired boilers.
Soorty’s production line continues to expand, and ZOZEN understands the needs of customers and custom-made energy-efficient coal-fired steam boiler system solutions for textile mills free of charge. Soorty was very satisfied with the boiler system solution and decided to purchase ZOZEN’s 10tons coal-fired boiler. This series of steam boilers has a wide range of fuel adaptation and can be used as a fuel for all types of coal in Pakistan. It uses dense water-wall tube and large furnace design to reduce heat loss and prevent coking. In addition, this series of chain grate boilers are highly mechanized, effectively reducing labor costs.
SZL series chain grate boiler adopts double drum longitudinal arrangement, the combustion mode is chain grate layer combustion. The water wall on both sides of the furnace adopts membrane water wall structure; The water wall pipe of the front and back wall of the furnace extends down to the upper part of the grate to form the front and back arch, which not only increases the sealing performance of the boiler, but also increases the volume of the furnace and the heating surface, and strengthens the strength of the back arch. After the furnace for the burning chamber, convection tube bundle, tail economizer (or air preheater). The flue gas enters the tail flue through the furnace, embers chamber, convection tube bundle, economizer (or air preheater), and is discharged into the atmosphere through the dust collector, induced draft fan and chimney.
Customer Feedback
ZOZEN not only provides us with high quality steam boilers, but also provides us with perfect service. From the start of the installation to the successful run, ZOZEN had technicians guide us, which saved us a lot of installation costs.
LEAVE A MESSAGE
For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.
Thanks for your subsmission! ZOZEN sales managers will contact you within 48 hours. Please check your email or whatsapp in time. If you do not receive the email in your normal inbox, please check your spam mail folder.